The Swissterminal informed us that due to an urgent overhaul of the crane of 30.11. as of 08.12.2018, only one crane instead of two will be available for handling in Frenkendorf (road and rail). Please note that during the inspection period, track capacity is greatly reduced, that is, we need to reduce single wagon traffic to 62% of the maximum capacity currently available. In order to avoid delays, we recommend, if possible, to transfer your Swiss Split bookings to other terminals during the period mentioned above.