Revision of the crane at Swissterminal Frenkendorf of 30.11. – 8.12.2018
The Swissterminal informed us that due to an urgent overhaul of the crane of 30.11. as of 08.12.2018, only one crane instead of two will be available for handling in Frenkendorf (road and rail). Please note that during the inspection period, track capacity is greatly reduced, that is, we need to reduce single wagon traffic [...]